What is waste?
Waste is, in fact, the opposite of value (a capability delivered to the customer through which the customer attains a tangible or intangible benefit).
So whatever feature or functionality or process step that neither adds value nor is used will be considered waste and should be eliminated from the system/product/process.

The seven wastes listed below were identified in manufacturing in the Toyota Production System (TPS) by Shigeo Shingo:
۱) Inventory: Unfinished goods (also called as “work in progress,” or WIP)
۲) Overproduction: Producing more than the demand requires
۳) Extra processing: Additional steps in the process that aren’t really needed
۴) Transportation: Shipping the goods from one place to the other
۵) Waiting: Lag between process steps
۶) Motion: Moving around within the process
۷) Defects: Flaws in the deliverables that impact their features/functionality

Reference: scrumalliance.org

گزیده:
ندارد

https://bibalan.com/?p=1004
یوسف مهرداد

یوسف مهرداد


کانال تلگرام

دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد. بخش‌های موردنیاز علامت‌گذاری شده‌اند *

برای خروج از جستجو کلید ESC را بفشارید